Development Process:






Decai High-tech new materials Company Limited has introduced four assembly lines that has precision in domestic top level. It specializes in the development and production of energy conservation and environmental protection.


No.1  workshop has building area of 26,000 square meters, which has already finished now. The workshop is divided into 4 areas: storage area, machining area. assembly area and maintain area.The storage area covers an area of nearly 10000 square meters, which has glass storage area covers an area of 5300 square meters of it. Slewing shelves have more than 700 pallets,, is mainly used for storing strip, bubble bar, etc.




Assembly area covers an area of more than 9,000 square meters.Injecting room covers an area of 70 square meter, which asks the temperature control in 10-28 degrees, humidity control in the 30% to 70% of clean constant temperature and humidity work environment.




Machining area covers an area of nearly 6000 square meters,has  six production lines.




Note: production and processing area




Note: double saw




Note: air compressor


  


  


March 9, 2014, came to the moral leadership of Qingdao High-Tech, High-Tech Production Manager moral listen carefully introduce the company's products.





Concern micro-channel